Skip to main content

Hydro Power Dam contract, 1955

 File — Box: 02, Folder: 18
Identifier: MSS001:02.18

Scope and Contents

The proposed contract between The Confederated Tribes of the Warm Springs Reservation and Portland General Electric Company which gives them permission for a hydro electric project to be built at the Pelton Dam site on the Deschutes River which is a part of the Warm Springs Reservation. Also included is a summary of the conditions for the contract.

Dates

  • Creation: 1955

Language of Materials

From the Collection:

English and Sahaptian languages

Conditions Governing Access

Collection is open for research.

Extent

From the Collection: 13.5 Linear Feet (25 boxes)

Repository Details

Part of the Southern Oregon University, Hannon Library Repository

Contact:
1250 Siskiyou Blvd.
Ashland OR 97520 US