Hydro Power Dam contract, 1955
File — Box: 02, Folder: 18
Identifier: MSS001:02.18
Scope and Contents
The proposed contract between The Confederated Tribes of the Warm Springs Reservation and Portland General Electric Company which gives them permission for a hydro electric project to be built at the Pelton Dam site on the Deschutes River which is a part of the Warm Springs Reservation. Also included is a summary of the conditions for the contract.